皇冠体育寻求亚洲战略合作伙伴,皇冠代理招募中,皇冠平台开放会员注册、充值、提现、电脑版下载、APP下载。

首页社会正文

Telegram群聊机器人(www.tel8.vip):TNB, PETRONAS to collaborate on joint feasibility studies on hydrogen and carbon capture

admin2023-03-137

皇冠最新登陆网址www.hg108.vip)实时更新发布最新最快的皇冠最新登陆代理线路网址、皇冠最新登陆会员线路网址、皇冠最新备用登录网址、皇冠最新手机版登录网址。

KUALA LUMPUR: Tenaga Nasional Bhd (TNB) intends to work with Petroliam Nasional Bhd (Petronas) on joint feasibility studies in the areas of hydrogen and carbon capture with a view to unlocking the commercial value of at least RM10 billion up to 2035, said TNB president and chief executive officer Datuk Baharin Din today.

The decarbonisation efforts would be achieved mainly through a collaborative study to develop a green hydrogen ecosystem and carbon capture and storage (CCS) technology, leveraging both organisations' technical expertise and resources.

In addition, the two companies will repower the retired combined-cycle gas-fired power plant, the Sultan Ismail Power Station (SIPS) in Paka, Terengganu by using gas with hydrogen-ready technology, said Baharin in a statement today.

TNB will be investing RM6.3 billion in the repowering of SIPS using high-efficient Combined Cycle Gas Turbine (CCGT) with hydrogen-ready technology for cleaner energy production.

Baharin said the repowering of the plant will leverage the strengths of both TNB and Petronas; and will serve as a unique pioneering project in deploying green technologies that may be utilised in future power plants.

"This brownfield project will start with the demolition of the existing plant next year and this will take two years. Construction of the project will commence from 2025 and the entire complex is scheduled to be ready in 2030,” he added.

,

Telegram群聊机器人www.tel8.vip)是一个Telegram群组分享平台。Telegram群聊机器人导出包括Telegram群聊机器人、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。Telegram群聊机器人为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

Upon commercial operation of the plant in 2030, the repowered Paka is projected to generate an average of RM250 million per year in earnings before interest and taxes.

"The repowering of Paka, with a capacity of 1,400 megawatts (MW) will avoid 3.2 million tonnes of carbon dioxide equivalent emission per annum, which is equivalent to the CO2 emitted by approximately 700,000 cars each year,” said Baharin.

As the country’s leading energy corporations, Baharin said TNB and Petronas have been forging cooperation for decades in the development of the energy sector and the betterment of the country.

Both TNB and Petronas have signed a memorandum of understanding (MoU) inked by both on Aug 19 to strengthen collaboration in driving innovative solutions toward decarbonisation, making it a historical milestone in supporting Malaysia’s aspiration to be a carbon-neutral nation by 2050.

"The MoU signals the recognition that our paths must converge, in order to realise a successful and inclusive energy transition for Malaysia. TNB has identified two technologies that will bring sustainable decarbonisation to our thermal assets and these are green hydrogen and carbon capture technologies,” said Baharin.

He added that TNB’s MoU with Petronas formed part of TNB’s accelerated Responsible Energy Transition, which is driven by Petronas' aspiration to be net zero by 2050 and the TNB’s target to reduce its coal capacity by 50 per cent and carbon emission intensity by 35 per cent in 2035.

网友评论

1条评论
  • 2023-03-13 00:12:54

    原题目:,华住回应男子夜半赤身突入主顾房间,:会有专人处置此事,其他情形不领会太硬核了

热门标签